Tell us what you are building
Send the scope, the site and the date that matters. Every enquiry is read by someone who could actually run the project — not a call centre.
Ways to reach us
- Call us+65 9176 2666Mon–Fri 9am–6pm, Sat 9am–1pm
- WhatsApp+65 9176 2666Quickest for photos of an existing site
- Email enquirieshuaxingdevelopment@outlook.comAttach drawings or tender documents
- Registered office33 Ubi Ave 3, Vertex Tower A #06-63, Singapore 408868Visits by appointment
Office hours
- Monday – Friday
- 9:00am – 6:00pm
- Saturday
- 9:00am – 1:00pm
- Sunday & Public Holidays
- Closed
Tender enquiries
Working to a tender closing date? State the date in your enquiry and we will confirm within one working day whether we can submit.
Hua Xing Development Pte. Ltd. · UEN 202008328R
Find our office
Our office is in Ubi, in Singapore’s eastern industrial belt. Site meetings are usually held at your property — office visits are by appointment.
33 Ubi Ave 3Vertex Tower A #06-63
Singapore 408868Open in Google Maps
The things clients ask before they appoint us
If your question is not here, ask it directly — you will get a straight answer rather than a brochure.
Have a drawing set, a tender document or just a rough idea? Send it across and we will tell you what is realistic.
Main contracting for new builds, design-and-build turnkey projects, addition and alteration (A&A) works, interior fit-out and renovation, end-of-lease reinstatement, and owner-side project management. Commercial, industrial and residential projects across Singapore.
An office or retail fit-out usually runs 8 to 14 weeks. A&A works on an occupied building typically run 4 to 12 months depending on the structural scope. A new build is generally 12 to 24 months. We commit to a programme only after a site survey, because access, existing conditions and authority submissions drive the timeline more than floor area does.
Yes. We coordinate with the Qualified Person and handle submissions to the relevant authorities — BCA, SCDF, NEA, PUB and URA as applicable — along with landlord and building management office permits for fit-out and reinstatement works. The applicable submissions for your project are confirmed in writing at proposal stage.
You receive an itemised proposal rather than a single lump figure: scope by trade, the programme, stated exclusions and the assumptions the price was built on. Where the scope cannot be fully defined yet, we identify it as a provisional sum instead of burying contingency in the rate.
Much of our work does. We plan around permitted working hours, noise and dust limits, tenant access and shared loading routes, and we publish a rolling look-ahead so occupants know what is happening and when. After-hours and phased sequencing are available where the building cannot tolerate daytime disruption.
Building works carry a twelve-month defects liability period as standard. During that period you report a defect to the same project manager who delivered the job, and we attend to it. Manufacturer warranties on supplied equipment and systems are passed through to you with the handover documentation.
Every enquiry is acknowledged within two working days. For live tenders with a closing date, tell us the date in your enquiry and we will confirm straight away whether we can meet it.
